6/2/2023 0 Comments Net reactor automationIn addition to the difficult environmental, delivery and inspection circumstances the inspection team were faced with the problem of doing an immersion inspection of the inside surface of the reactor vessel through a small 4.75? access port at a distance of more than 30 ft to the inspection area at the bottom of the reactor. Eclipse Scientific in collaboration with Utex Scientific Instruments and Liburdi Automation developed the NDE inspection system for the In-Service Inspection program of the NRU vessel. Since the NRU vessel?s return to service, a series of periodic inspections is required to ensure the safe operation of the reactor. In 2009-2010 repairs were performed in order to restart medical isotope production mid-August 2010. Abstract: In May of 2009, the NRU (National Research Universal) reactor was forced to shut down after a small heavy water leak.
0 Comments